Liquid Penetrant Testing (LPT) (Level III)Test 01 Quiz
Question 1 of 10
(0) Correct Answers
Question.
The best method of drying after the application of a wet developer is normally:
A blotting the surface gently with absorptive paper towelling.
Allowing the part to dry slowly at or slightly below the ambient temperature.
Rapid drying with a normal room temperature air blast.
Drying with circulating air at a maximum of 71 0 C (160 0F).
Next question
Back to Tests
Back to Home